Through the mountains Switzerland and Italy are even closer
Country
ITALY
Area
NORTH ITALY
Location
ARCISATE
Duration
2015 – 2017
Employer
RFI S.p.A. (Rete Ferroviaria Italiana)
PCM/Engineer
Italferr S.p.A.
General Contractor
Salcef S.p.A.
Subcontractor
–
Joint Venture
No
Salcef share
100%
Salcef Project Manager
Bruno Giovannini
Project Description
Salcef is responsible for completion works on the new Arcisate-Stabio line, on the section between the bridge over the River Olona and the Swiss border, including the morphological remodelling of the areas involved.
Scope of Work
- Doubling of 4.8 km of existing ballasted line
- Construction of 4.5 km of new ballasted double lineÂ
- Execution of dugouts, 8 tunnels, 1 bridge, 1 viaduct, 5 underpasses and 8 overpasses
- Construction of 2 stations and 1 stop
- Hydraulic accommodation
- Replacement of a level crossing with a new road network
- Dismantling of old materials