A NEW METRO LINE FOR THE ROMANIAN CAPITAL
Country
ROMANIA
Area
SOUTHERN ROMANIA
Location
BUCHAREST
Duration
2017 – 2019
Employer
Metrorex S.A.
PCM/Engineer
Metroul S.A.
General Contractor
Astaldi S.p.A.
FCC Construccion S.A.
UTI Grup S.A.
Activ Group Management SRL
Subcontractor
Salcef S.p.A.
Joint Venture
No
Salcef share
100%
Salcef Project Manager
Salvatore Panetta
Project Description
Salcef built about 7.5 km of double track line, as well as 5 maintenance lines on the pit track in depot and installation along the entire line of the third rail.
The work involved a total of 15 km of slab track on concrete blocks (EBS – Embedded Block System).
Scope of Work
- Construction of 15 km of track on EBS
- Construction of 5 pit track lines in the depot
- Installation of the third rail along the entire line
- Installation of 43 turnouts and 5 double crossovers