HIGH SPEED LINKING ITALY FROM NORTH TO SOUTH
Country
ITALIA
Area
TOSCANA – EMILIA-ROMAGNA
Location
FIRENZE – BOLOGNA
Duration
2006 – 2011
Employer
Ferrovie dello Stato Italiane
Italferr SISTAV S.p.A.
PCM/Engineer
SPM S.r.l.
General Contractor
FIAT S.p.A. (General Contractor)
Consorzio CAVET (Sub General Contractor)
Consorzio CAVET (Sub General Contractor)
Subcontractor
I.C.A.V. (Imprese Consorziate Alta Velocità ) Consortium:
- Salcef S.p.A.
- G.C.F. S.p.A.
- GEFER S.p.A.
- Euro Ferroviaria S.r.l.
Joint Venture
Yes
Salcef share
25%
Salcef Project Manager
Angelo Di Paolo
Project Description
Salcef carried out construction works on the permanent way of the Florence-Bologna high-speed double track line, on which trains can reach a maximum speed of 350 km/h.
Scope of Work
- Construction of 117.1 km of track on pre-stressed reinforced concrete sleepers
- Construction of 37 turnouts laid on concrete bearers