Project Description
Preliminary design of a new transport system for the Maputo and Matola districts, based on the integration and cooperation between the surface metro system, tramway lines, BRT and bus lines.
Scope of Work
- 116 km of ballasted surface metro including a signalling system
- 66 km of slab track tramways
- 210 km of BRT lines
- 1,852 km of bus lines
- Centralized Control System
- Ticketing and info mobility system