UPGRADING THE TEN-T NORTH SEA BALTIC LINK
Country
POLAND
Area
NORTHERN POLAND
Location
–
Duration
2011 – 2015
Employer
PKP Polskie Linie Kolejowe S.A.
PMC/Engineer
–
General Contractor
Salcef S.p.A.
Subcontractor
–
Joint Venture
No
Salcef share
100%
Salcef Project Manager
Valerio Antenucci, Alessandro Simone
Project Description
Salcef carried out the modernization works of some sections on the Koscierzyna and Chorzow Batory – Tczew railway corridors and the revitalization of the Olsztyn-Szczytno-Szymany and Reda-Hel railway lines.
Scope of Work
- Design
- Procurement of materials
- Dismantling of the existing track
- Replacement of the permanent way and substructure
- Installation of 48 turnouts
- Refurbishment of level crossings, platforms, bridges and viaducts
- Construction of 13 platforms
- Renewal of the overhead contact line
- Reconstruction of drainage
- Installation of telecommunication systems on the main line and stations
- Auxiliary works on the signalling system