ENHANCEMENT WORK TO IMPROVE MOBILITY IN THE MARCHE REGION
Country
ITALY
Area
MARCHE
Location
CASTELPLANIO – MONTECAROTTO (AN)
Duration
2015 – 2018
Employer
RFI S.p.A.
PMC/Engineer
Italferr S.p.A.
General Contractor
Consorzio Stabile ITACA S.c. a r.l.
Subcontractor
Salcef S.p.A.
Joint Venture
Sì
Salcef share
100%
Salcef Project Manager
Marcello Bettancini
Project Description
The new track develops partially alongside the existing line, partly following a planimetric variation that crosses the Esino River at two points, over two new railway viaducts.Â
Salcef was responsible for 12 km of track and overhead line, as well as civil works for environmental sustainability and improved mobility.
Scope of Work
- 12 km of new track and overhead lineÂ
- 4 km of new railway embankment
- Installation of 4,193 m of noise barriers
- 2 railway viaducts
- 10 underpasses
- Hydraulics protection works
- New Local Strategic Plan of Castelplanio-Cupramontana station