Modernizing Strategic Rail Corridors to the North and East of Cairo
Country
EGYPT
Area
LOWER EGYPT
Location
CAIRO – ALEXANDRIA – SUEZ – ISMAILIA
Duration
2026 – ongoing
Employer
Egyptian National Railways (ENR)
General Contractor
Salcef Track for Railway Infrastructure (Salcef Track)
Salcef Project Manager
Massimiliano Salciccia
Project Description
The project is part of the modernization programme of the Egyptian National Railways (ENR) network and covers selected corridors north and east of Cairo.
The works involve the rehabilitation of approximately 300 kilometres of railway track and the renewal of 200 turnouts. The scope includes main line track renewal with ballast cleaning, full track renewal within station areas, renewal of level crossings and the construction of a Long Welded Rail (LWR) welding plant.
The sections included in the project are as follows:
- Cairo – Alexandria line: 187.7 km of main line track, 10.1 km of siding track, 84 turnouts and 35 level crossings
- Qabbary – Matrouh line: 2 km of siding track, 13 turnouts and 1 level crossing
- Mansoura – Matariyyah line: 1.5 km of siding track and 6 turnouts
- Nefisha – Suez line: 8.1 km of main line track, 11.7 km of siding track, 50 turnouts and 6 level crossings
- Adabia – El Ain Sukhna line: 10 km of main line track, 1 km of siding track, 1 turnout and 4 level crossings
Cairo (Ain Shams) – Suez line: 53.1 km of main line track, 14.6 km of siding track, 46 turnouts and 11 level crossings
Scope of Work
Salcef Track is responsible for:
- Rehabilitation of approximately 300 km of railway track
- Renewal and installation of 200 turnouts